PEPCO Gaithersburg MD


Ground Protection

Plane Crash into Maryland Transmission Tower (PEPCO 96N-104N)

600 Mats mobilized to stabilize ground for Electrical Contractor to restore power

DPL Spring Corrective Maintenance


Ground Protection

Maintenace to seven different Electrical Circuits across Maryland & Delaware

Mats
1500+

ACE Pad Swedesboro, NJ


Ground Protection

Large Wood Mat Staging Area for Project Material

Mats
900 CLT Mats

Vienna River Crossing


Ground Protection

UCS provided 4 layers of Mats in tidal waters of the Nanticoke River

DPL Laurel Delaware Tornado


Ground Protection

2019 Tornado caused severe damage to Electrical Structure's. UCS mobilized over 500 Mats that night so the Electrical Contractor could stabilize and replace the steel structure and restore power.

Perryville Water Main Break


Traffic Control

UCS provided a lane shift to allow utility contractors to repair water main break in Perryville MD

BGE Five Forks to Windy Edge Culvert Replacement


Ground Protection

MDE Emergency replacement of 36" CMP to 60" HDPE

PEPCO Charlotte Hall Culvert Replacement


Ground Protection

Replacement of two culvert to gain access for contractor to repair electrical structure

Highway 301 Rolling Roadblock


Traffic Control

UCS Traffic Control Provided a Rolling Roadblock to stop traffic on highway 301 for electrical contractor to pull wire across the highway

Indian River Pole Replacement


Traffic Control

UCS provided Traffic Control for Electrical Contractor to replace multiple poles along Coastal Highway, Bethany Beach Delaware.